NanoSeal NB
NanoSeal NB

Surface Intelligence

Executive Surface Preservation Proposal

Sample

Planning-level portfolio summary prepared by Surface Intelligence · 7/2/2026

1. Executive Summary

Surface Intelligence reviewed a sample Atlantic Canada portfolio of 12 assets. Based on surface condition, exposure, replacement exposure, and preservation potential, 5 assets are recommended for first-cycle professional review. The suggested budget for this cycle is $100,000.

This planning-level proposal helps portfolio owners focus limited maintenance dollars on the surfaces that deserve specialist attention first. It is not a contractor quote or engineering assessment.

2. Portfolio Snapshot

Assets Reviewed

12

High-Priority Assets

5

Preservation Candidates

12

Replacement Exposure

$3,125,000

total portfolio

Suggested Review Budget

$100,000

first cycle

Planning Confidence

Moderate

based on self-reported data

3. Recommended First-Cycle Priorities

Assets ranked by risk, preservation potential, and replacement exposure within a $100,000 budget.

AssetCitySurfaceRiskReview CostReplacement ExposurePriority Reason
Riverfront PlazaMonctonParking slab / concreteHigh$18,000$260,000High risk - prioritize review
Northside WarehouseFrederictonFlat roof / concreteHigh$26,000$420,000High risk - prioritize review
Maple Ridge ApartmentsFrederictonAsphalt shingle roofHigh$12,000$185,000High risk - prioritize review
Sussex Walkway NetworkSussexSidewalk networkHigh$34,000$480,000High risk - prioritize review
Oromocto Municipal GarageOromoctoGarage floor / concreteModerate$9,500$140,000Preservation opportunity

4. Budget Scenario

Selected Budget

$100,000

Recommended Assets Covered

5 / 12

Total Review Cost

$99,500

Replacement Exposure Reviewed

$1,485,000

Remaining Budget

$500

Opportunity Ratio

14.9x

Exposure per dollar spent

5. Recommended Next Steps

  1. 1Confirm asset list and property access
  2. 2Collect current photos and site notes for priority assets
  3. 3Schedule professional review for high-risk concrete and roof assets
  4. 4Prepare preservation vs. replacement cost discussion for stakeholders
  5. 5Build annual monitoring plan for deferred assets
  6. 6Revisit Capital Planner scenario with updated inspection data

6. Professional Review Path

Based on asset types and surface concerns identified in this portfolio, the following professional review paths may be appropriate.

Recommended Review Paths

NanoSeal NB Surface Review logo

NanoSeal NB Surface Review

Available

Surface Preservation

Roof, concrete, and exterior surface preservation review for Atlantic Canada.

Atlantic Canada

506-800-5305

Additional review paths will be added as the platform grows.

Ready to start your pilot?

Turn this sample into a real portfolio review with a paid pilot.

Request This Pilot
Planning-level proposal only. Does not replace professional inspection, engineering review, contractor quote, insurance assessment, or capital reserve study. Generated by Surface Intelligence.